CM Construction Services, INC.
Customers
1
1 federal agency
Suppliers
4
4 federal subcontractors
Largest customer
—
No % disclosed
Named-customer revenue
—
No estimate available
Federal obligations
$3.2M
FY2026 · USAspending.gov
Federal contracts 1
Agencies that awarded contracts to this company, from USAspending.gov. Dollars are obligated amounts as reported, not estimates; $3.2M in the latest fiscal year shown per agency.
| Agency | Obligated | Fiscal year | Awards | Trend | Largest award |
|---|---|---|---|---|---|
| Department of Defense
Department of the Air Force |
$3.2M | FY 2026 | 21 | $33.0M → $44.9M → $11.6M → $3.2M | FA461024F0116 |
REPAIR LANDSLIDE AT OAK MOUNTAIN ON VANDENBERG SPACE FORCE BASE, CALIFORNIA | |||||
Federal subcontractors 4
Companies this contractor subcontracted work to on federal prime contracts. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| West Pacific Electric Company Corporation | $8.7M | FY 2025 | 1 | FA461024F0207 | |
DEVELOP, SUPPLY A B9 & B7 CIRCUIT COORDINATION STUDY. • ALL OUTAGE NARRATIVES AND MOPS WILL BE WRITTEN BY WPEC WITH PERFORMANCE DATES AND TIMES STATED IN THE WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CE SWITCHING SCHEDULE AND REQUEST MADE BY WPEC. • PERFORM TRAFFIC CONTROL PER PLAN (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER) • USE OF VACUUM UTILITY LOCATING • OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED • FOR ELECTRICAL WORK ONLY WPEC TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE SOILS, SAND AND OR RED CONCRETE ENCASED DUCT BANK. • ROADWAY REPAIR “PATCH WORK” FOR ELECTRICAL WORK ONLY. • EARTHWORK FOR ALL SECTIONAL SWITCHES AND TRANSFORMER EQUIPMENT PADS, DEPRESSED CURBS, SIDEWALKS & RAMP REPAIR. • IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION ACTIVITIES WILL NOT BE COMMENCED OR CONTINUED UNLESS THE PARTIES AGREE UPON ADDITIONAL COMPENSATION AND OR ADDITIONAL TIME FOR COMPLETION AND THE CONTRACT IS ADJUSTED ACCORDINGLY. • SUPPLY ALL CONCRETE AND ASPHALT MATERIALS AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL WORK REQUIRED TO COMPLETE THE PROJECT. • ALL TREE TRIMMING/REMOVAL, GRUB AND CLEAR WILL FOLLOW VAFB STANDARDS WILL BE PERFORMED DURING THE NONNESTING AND DRY SEASON. | |||||
| Smith Mechanical-electrical-plumbing | $4.5M | FY 2025 | 4 | FA461025F0083 | |
AS REQUIRED TO INSTALL NEW FAN COILS, DUCT WORK, AND PIPING. INSTALL NEW HEATING HOT WATER, CHILLED WATER, REFRIGERANT AND CONDENSATE PIPING AS REQUIRED. FURNISH AND INSTALL DUCTWORK DISTRIBUTION PER SMACNA STANDARDS. INSULATE DUCT AND PIPING AS REQUIRED. INSTALL NEW AUTOMATED LOGIC CONTROLS. AIR BALANCE BY A THIRD-PARTY CONTRACTOR. PROVIDE AND INSTALL NEW LOW PROFILE LIGHT FIXTURES IN T-BAR CEILINGS. RELOCATION OF FIRE SPRINKLERS TO ALLOW FOR INSTALLATION OF DUCTWORK. | |||||
| Mcdonnell Roofing, INC | $760.5K | FY 2025 | 1 | FA461025F0072 | |
ROOFING DEMOLITION AND HAUL OFF ACRYLIC 20YR COATING STEEP SLOPE TILE, FELT, BATON BOARD & NAILS REMOVAL & DISPOSAL STEEP SLOPE CAP SHEET UNDERLAYMENT STEEP SLOPE BATON BOARDS STEEP SLOPE COPPER VALLEY METAL STEEP SLOPE COPPER EDGE PERIMETER METAL STEEP SLOPE FELT COPPER FASTENERS STEEP SLOPE BATON COPPER FASTENERS STEEP SLOPE TILE COPPER FASTENERS STEEP SLOPE EDGE TRIM COPPER FASTENERS COPPER VENTS & LOUVER VENTS STEEP SLOPE TILE LOADING STEEP SLOPE TILE INSTALL TESTING, INSPECTIONS AND WARRANTIES | |||||
| Paso Robles Tank, INC | $541.0K | FY 2025 | 1 | FA461025F0077 | |
TURNKEY TANK AND FOUNDATION INSTALLATION, PER GOVERNMENT APPROVED PASO ROBLES TANK, INC., DESIGN/ENGINEERING AND CIVIL DESIGN/ENGINEERING BY MNS ENGINEERS, INC., INCLUDING, 1. TANK DESIGN, ENGINEERING, COORDINATION, FABRICATION, ERECTION, AND COATINGS. 2. NEW RING WALL TANK FOUNDATION COMPLETE (FULL SLAB IF REQUIRED WILL BE A CHANGE ORDER). A. FURNISH AND INSTALL REBAR, BOLTS, ANCHORS, PLACE CONCRETE PER DESIGN, BACKFILL PERIMETER TO SUBGRADE AND BACKFILL INTERIOR SUBGRADE WITH 6” CLEAN SAND UNDER TANK FLOOR. 3. CATHODIC PROTECTION SYSTEM. 4. HOLD POINT NACE (IN-HOUSE) COATINGS INSPECTION. 5. HYDRO-TESTING AND WASH DOWN / DISINFECTION.. | |||||
Alerts are coming
Get an email when CM Construction Services, INC.'s disclosed suppliers or customers change. Join the list and we'll tell you when alerts launch. One email, no spam.