Beyond NEW Horizons, LLC
Customers
1
1 federal agency
Suppliers
33
33 federal subcontractors
Largest customer
—
No % disclosed
Named-customer revenue
—
No estimate available
Federal obligations
$384.9M
FY2026 · USAspending.gov
Federal contracts 1
Agencies that awarded contracts to this company, from USAspending.gov. Dollars are obligated amounts as reported, not estimates; $384.9M in the latest fiscal year shown per agency.
| Agency | Obligated | Fiscal year | Awards | Trend | Largest award |
|---|---|---|---|---|---|
| Department of Defense
Department of the Air Force |
$384.9M | FY 2026 | 1 | $17.1M → $496.1M → $384.9M | FA910124CB002 |
TEST OPERATIONS AND SUSTAINMENT (TOS) II | |||||
Federal subcontractors 33
Companies this contractor subcontracted work to on federal prime contracts. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| Mitternight Boiler Works INC | $16.2M | FY 2025 | 1 | FA910124CB002 | |
COOLER DESIGN, MATERIALS, FABRICATION, EXAMINATION, TESTING, STORAGE AND / OR DELIVERY SHALL BE IN ACCORDANCE WITH COOLER SPECIFICATION (15871-HU6-3PS-EXH-00002 COOLER EQUIPMENT SPECIFICATION - DISTRIBUTION A). | |||||
| NTC Mazzuca Contracting INC | $5.2M | FY 2025 | 1 | FA910124CB002 | |
SERVICE, ON-SITE, SECURITY UPGRADE DESIGN AND BUILD - MODIFICATIONS TO EXISTING BUILDING INFRASTRUCTURE AND PUTTING UP A NEW BUILDING TO ALLOW TESTING AT TUNNEL 9 AT A HIGHER SECURITY LEVEL | |||||
| TDG TransDigm Group INC |
$4.9M | FY 2025 | 2 | FA910124CB002 | |
NHTF MODEL POSITIONING SYSTEM | |||||
| A&B Foundry, LLC | $3.8M | FY 2025 | 1 | FA910124CB002 | |
"DIFFUSER MATERIALS, FABRICATION, EXAMINATION, TESTING, STORAGE AND / OR DELIVERY SHALL BE IN ACCORDANCE WITH DIFFUSER DRAWING PACKAGE, DIFFUSER STATEMENT OF WORK (15871-HU6-3SW-EXH-00002_000), DIFFUSER WELDING SPECIFICATION (15871-HU-3PS-000-00006_000 ENGINEERING SPEC FOR WELDING). DIFFUSER INSTALLATION TO BE PER-FORMED BY OTHERS. | |||||
| AMTM Amentum Holdings, Inc. |
$3.7M | FY 2025 | 3 | FA910124CB002 | |
SERVICE, SUBCONTRACTOR TO DESIGN, PROCURE, FABRICATE, PROGRAM, TEST, DELIVER, AND INTEGRATE THE FOLLOWING (3) TEST CONTROL SEQUENCERS FOR NHTF: 1) DF4 TEST CONTROL SEQUENCER 2) DF5 TEST CONTROL SEQUENCER 3) DF6 TEST CONTROL SEQUENCER MILESTONE PAYMENT SCHEDULE: O 10% - PROJECT AWARD O 10% - 30% DESIGN REVIEW O 30% - 60% DESIGN REVIEW O 20% - FINAL DESIGN REVIEW O 25% - FACTORY ACCEPTANCE O 5% - SITE ACCEPTANCE OR 20 WEEKS AFTER DELIVERY" | |||||
| Dezurik, INC. | $3.1M | FY 2025 | 1 | FA910124CB002 | |
VALVE, 72" DUCT ISOLATION BUTTERFLY VALVE MATERIALS, FABRICATION, EXAMINATION, TEST, STORAGE AND / OR DELIVERY SHALL BE IN ACCORDANCE WITH THE FOLLOWING EXHAUST DUCT VALVE SPECIFICATION (15871-HU6-3PS-EXH-00012_000). | |||||
| Enfuse.io, INC. | $2.3M | FY 2025 | 4 | FA910124CB002 | |
SERVICE - ENFUSE SOFTWARE ENGINEERING/DEVELOPMENT SUPPORT FOR CTDSS PLATFORM. FINISH WORK ON PL2 PLATFORM. SUPPORT PL3 SOFTWARE DEVELOPMENT TO ACHIEVE A FUNCTIONING PLATFORM. | |||||
| Lovvorn Abatement & Insulation, LLC | $2.3M | FY 2025 | 7 | FA910124CB002 | |
ABATE AND ADDRESS ASBESTOS INSULATION ISSUES ON THE PROCESS AIR DUCTING OF THE B-EXHAUST COMPRESSOR PRESSURE CONTROL DISCHARGE LINES COMMONLY REFERRED TO AS THE B-EXHAUST DUMP STACK DUCTING. THIS INCLUDES SCAFFOLD CONSTRUCTION AND INSPECTION TO ALLOW ACCESS TO AREAS FOR ASBESTOS ABATEMENT, ADDRESSING THE DAMAGED INSULATION LOCATED ON THE B-EXHAUST DUMP STACK DUCTING, AND PUTTING IN PLACE MITIGATIONS TO PROTECT AGAINST FUTURE INSULATION DETERIORATION. THE B-EXHAUST DUMP STACK DUCTING IS IN THE B-PLANT EXHAUST SIDE BUILDING #879. THE DUCT IS WRAPPED WITH ASBESTOS INSULATION THAT IS WATER DAMAGED TO THE POINT OF DETERIORATION SUCH THAT ASBESTOS FIBERS FREE-FALL FROM THE BOTTOM HALF OF THE DUCT DUE TO VIBRATIONS WHICH OCCUR DURING PLANT OPERATION. SEVERAL KNOWN LEAKS ARE PRESENT. THE CURRENT CONDITION OF THE DUCT IS UNKNOWN DUE TO THE INSULATION COVERAGE. TO ASSESS THE CURRENT AND FUTURE CONDITION OF THE DUCTING A MORE EFFICIENT APPROACH IS NECESSARY TO HELP WITH THE REMOVAL OF THE INSULATION. NUMEROUS LOCATIONS ON THE DUCT ARE CURRENTLY INACCESSIBLE WITHOUT SCAFFOLDING. AS SUCH, DURING SCAFFOLD CONSTRUCTION, AND AS NEW AREAS ARE REVEALED AND BECOME ACCESSIBLE, CONTINUAL ASBESTOS CLEANUP WILL HAVE TO OCCUR ALONGSIDE SCAFFOLD CONSTRUCTION. ONCE THE SCAFFOLD IS CONSTRUCTED, THE DAMAGED ASBESTOS WILL NEED TO BE ABATED. ONCE THIS WORK IS COMPLETED, THE SCAFFOLD WILL BE DECONSTRUCTED, AND THE WASTE DISPOSED OF VIA AEDC'S ASBESTOS LANDFILL. | |||||
| Votaw Precision Technologies, LLC | $2.2M | FY 2025 | 2 | FA910124CB002 | |
FABRICATE A MACH NOZZLE AND CARRIAGE ASSEMBLY | |||||
| Sulzer International AG | $2.0M | FY 2025 | 1 | FA910124CB002 | |
MOTOR REWIND SERVICES | |||||
| Wells Technology, INC. | $1.5M | FY 2025 | 2 | FA910124CB002 | |
ON-SITE MRO STORE | |||||
| Cworks Operating Company, LLC | $1.4M | FY 2025 | 6 | FA910124CB002 | |
RENTAL DRAGONFIRE: CRANE AND OPERATOR, OILER WITH CRANE MATS. DURATION 3 MONTHS, APROX 60HRS PER WEEK. CRANE DETAILS: PAYLOAD WEIGHT: 60,000 LBS MAXIMUM CRANE RADIUS FOR SET / PICK: 60' CRANE WITH OPERATOR - $750/HR - OILER $85/HR - EST 60HRS/WK OT - $870 / 114 PER HOUR PER DIEM PER PERSON - $200 TRANSPORT IN/OUT - $11,176 EA ALLOWABLE GROUND PRESSURE @ SITE: 3,000 PSF" | |||||
| CG Model TEK LLC | $1.4M | FY 2025 | 6 | FA910124CB002 | |
COMPLEX METAL FABRICATION | |||||
| Foxlein Holdings LLC | $1.3M | FY 2025 | 1 | FA910124CB002 | |
PIPE SPOOL MATERIAL, FABRICATION, EXAMINATION, TESTING, STORAGE AND / OR DELIVERY SHALL BE IN ACCORDANCE WITH DUCT DRAWING PACKAGE (15871-HU6-MD-EXH-00002_000), DUCT STATEMENT OF WORK (15871-HU6-3SW-EXH-00001_000), ,EXHAUST DUCT SPECIFICATION (15871-HU6-3PS-EXH-00004_000), AND DUCT WELDING SPECIFICATION (15871-HU6-3PS-EXH-00009_000). DUCT INSTALLATION TO BE PERFORMED BY OTHERS. | |||||
| En-net Services, L.L.C. | $1.2M | FY 2025 | 9 | FA910124CB002 | |
RUCKUS ICX7550 24-PORT 1/10 GBPS WITH 2-PORTS 40/100 GBPS UPLINK/STACK QSFP28; MODULE SLOT; TWO AC POWER SUPPLIES; THREE FANS EXHAUST AIRFLOW INSTALLED. TRANSCEIVERS SOLD SEPARATE. P/N- ICX7550-24F-E2 | |||||
| Govsmart, INC. | $1.1M | FY 2025 | 5 | FA910124CB002 | |
NETAPP AFF-C800 1PB SYSTEM WITH 4PT-10GBE. INCLUDE THE FOLLOWING: ONTAP ONE, ENCRYPTION BUNDLE; SUPPORTEDGE ADVISOR; ADVISOR PLUS,NBD PARTS REPLACEMENT; NON-RETURNABLE DRIVES,PROTECT FOR GOVERNMENT . THE AFF C800 SYSTEM SHOULD INCLUDE THE FOLLOWING: QTY 2 AFF C800 HA SYSTEM; QTY 1 AFF C800,HA,CTL,ENCL,100G,-C; QTY 2 DATA AT REST ENCRYPTION CAPABLE OPERATING SYS; QTY 4 POWER SUPPLY,1600W; QTY 4 JUMPER CRD, IN-CAB, C13-C14; QTY 16 SFP+ FOR X1117A,OPTICAL,10GBE,R6; QTY 1 RAIL KIT,4-POST,RND/SQ-HOLE,ADJ,24-32; QTY16 CABLE,LC-LC,OM4,2M; QTY 1 DOCUMENTS,AFF-C800; QTY 15 DRIVE PACK,NVME,SED,CF,2X30.7TB; QTY 4 NIC 4-PORT BARE CAGE 10GBE SFP+ PCIE; QTY 9210 SW,ONTAP ONE PACKAGE,PER-0.1TB,CF,C06; QTY 1 SUPPORTEDGE ADVISOR; QTY 1 ADVISOR PLUS FOR SYSTEM; QTY 1 NEXT BUSINESS DAY PARTS REPLACEMENT; QTY 1 NON-RETURNABLE DRIVES (HDDS,SSDS); QTY 1 SUPPORTEDGE PROTECT FOR GOVERNMENT GOVSMART QUOTE GS25012431A7B SEWP V CONTRACT NNG15SD11B" | |||||
| Fagioli, INC. | $1.1M | FY 2025 | 1 | FA910124CB002 | |
SERVICE: PROVIDE NECESSARY EQUIPMENT'S, LABOR, SUPERVISION, TOOLS & CONSUMABLE TO SUPPORT THE FOLLOWING ACTIVITIES. TRANSPORT THREE PRESSURE VESSELS APPROXIMATELY 2 MILES FROM THEIR STORAGE LOCATION TO INSTALLATION LOCATION TWO OF THE PRESSURE VESSELS (498,000 LBS) ARE STORED ON STORAGE STOOLS (THREE STOOLS UNDER EACH SADDLE - TWO TRANSPORT SADDLES AND (6) STOOLS). MIDDLE STORAGE STOOL NEEDS TO BE REMOVED USING JACKING METHOD TO FACILITATE POSITIONING OF HYDRAULIC PLATFORM TRAILER UNDERNEATH. THIRD PRESSURE VESSEL (100,000 LBS) IS STORED ON GROUND AND TO BE LIFTED USING CRANE / GANTRY TO POSITION TRAILER UNDERNEATH. INSTALL THE PRESSURE VESSELS ON STRUCTURAL STEEL SUPPORTS (INSTALL ELEVATION 30' FROM GRADE LEVEL). PROVIDE FLOWING LIFT EQUIPMENT (MINIMUM SHOWN) ON O & M BASIS. O 600 TON OR HIGHER CLASS CRAWLER CRANE WITH SUPER LIFT / MAXER ATTACHMENT (M18000 WITH MAXER OR EQUIVALENT) - LIFT PARAMETERS 500 KIPS @ 100' RADIUS. MIN BOOM LENGTH: 140'-160' O TAIL CRANE - LIFT PARAMETER (300 KIPS @ MIN. 30' RADIUS) - AT OR CRAWLER CRANE O HYDRAULIC PLATFORM TRAILER - 18 AXLE LINES WITH PRIME MOVER (MAX. AXLE LINE LOADING ALLOWED AT SITE - 40,000 LBS) OR SPMT WITH POWER PACK O FORKLIFT, MAN LIFT ETC. O RIGGING HARDWARE (SLINGS, SHACKLES, SPREADER BAR, HYDRAULIC JACKS ETC.) FOR LIFTING, TAILING, CRANE ASSEMBLY / DISMANTLING ETC. O SUPERVISOR FOR THE CRANE AND RIGGING WORK O ASSEMBLY / DISMANTLING DIRECTOR, CRANE OPERATORS, RIGGERS ETC. O CRANE MATTING / OUTRIGGER PAD ETC. - ALLOWABLE GROUND PRESSURE AT SITE IS 3,000 PSF. LIFT STUDY TO SUPPORT SUITABILITY OF THE LIFT EQUIPMENT THE ABOVE WORK SHALL BE PERFORMED ON A TURNKEY BASIS BY SUBCONTRACTOR. SUPPORTING DATA: VESSEL 1 - 498,000 LBS - 43' L X 18.5' W X 14'-6"" H VESSEL 2 - 498,000 LBS - 43' L X 18.5' W X 14'-6"" H VESSEL 3 - 100,000 LBS - 15.5' L X 7.5' W X 9' H" | |||||
| Wafo & Gran LLC | $1.1M | FY 2025 | 19 | FA910124CB002 | |
CONNECTOR, MC/AC CABLE, 3/8 INCH, SNAP-TITE INSULATED THROAT ZINC DIE-CAST CONNECTOR - FOR AC/MC CABLE RANGE .405 TO .612, ARLINGTON P/N 38AST, GEXPRO P/N 57695 | |||||
| Ashtead Group Public Limited Company | $962.0K | FY 2025 | 13 | FA910124CB002 | |
RENTAL: TRENCH BOX 10X16FT-4"" WAL, TRENCH BOX 10X16 AND 6' AND 8' SPREADERS. DURATION 1 MONTH. INCLUDES THE FOLLOWING: -ALUMINUM BOX 8X12FT - $1035.30/MO -PERSONAL RETRIEVAL SYSTEM - $1445/MO -8"" PIPE SPREADER - $147.90/MO -2AEX BOX LET 24"" - $138/MO -2AEX TUBE STRUT 38 - $53.55/MO -TRENCH BOX PIN 1.75"" X 10"" - NC -TRENCH BOX LADDER AS - $150/MO -LIFT SLING-4 LEG-51/16"" X 10FT - $153/MO -ROAD PLATE 20X8FT - $459/MO -LOCK N LIFT PLATE - $63/MO P/U & DELIVERY $585 EA" | |||||
| United Rentals (north America), INC. | $919.8K | FY 2025 | 11 | FA910124CB002 | |
TRAILER, 36' X 60', MODULAR, NEW, STEEL ROOF TRUSSES, MULTIPLE OFFICES, WIND LOAD 120 MPH, FLOOR LIVE LOAD 100 LBS. PROVIDE DELIVERY, LABOR, SET-UP, AND INSTALLATION OF THE TRAILER AND ALL REQUESTED FURNISHINGS. PLEASE SEE SOW FOR FULL DETAILS AND LAYOUT. | |||||
| SME Trucking And Excavation, LLC | $899.9K | FY 2025 | 1 | FA910124CB002 | |
BACKFILL DIRT | |||||
| HRI HERC HOLDINGS INC |
$831.6K | FY 2025 | 13 | FA910124CB002 | |
RENTAL: TRANSFORMER TO INCLUDE: TRANSFORMER 1500KVA PADMOUNT 15KVA SWITCH 3000 AMP ATS 3000 AMP I LINE 2000 AMP MAIN BREAKER SKID MOUNT DISCONNECT BREAKER PANEL 400A DISCONNECT BREAKER PANEL 100A" | |||||
| Bronco Industrial Services, LLC | $815.8K | FY 2025 | 1 | FA910124CB002 | |
FABRICATION - STRUCTURAL STEEL, BOTTLE RACK, VENDOR TO DESIGN, FABRICATE, AND DELIVER PER 15871-HUT-3SW-HPA-00001 REV 000. | |||||
| Core LLC | $781.0K | FY 2025 | 1 | FA910124CB002 | |
ON-SITE MEDICAL SERVICES | |||||
| Konark Software Solutions LLC | $742.0K | FY 2025 | 1 | FA910124CB002 | |
CONSULTANTS BP LOGIX - T&M WITH FIXED LABOR RATES CONSULTANT SUBCONTRACT WITH A NTE OF $742,000 TO PROVIDE PROCESS DIRECTOR CONSULTING SERVICES. CONSULTING LABOR HOURS TO AID IN THE ANALYSIS, REQUIREMENTS GATHERING, AND DEVELOPMENT OF BUSINESS PROCESSES WITHIN AEDC'S BP LOGIX PROCESS DIRECTOR. PERIOD OF PERFORMANCE 4/15/25 THRU 4/14/26 | |||||
| Phoenix Dynamometer Technologies, LLC | $702.5K | FY 2025 | 1 | FA910124CB002 | |
"INPUT, TEMPERATURE, (BUNDLE OF 8 CABLES), TYPE K THERMOCOUPLE, 6FT LENGTH, 1/8"" SHANNK AND 6"" INSERTION LENGTH, MOUNTING FITTINGS HAVE 1/8"" NPT MALE THREADS, 6FT HOSE LENGTH. ORIGINAL PRICE $4,375 - 60% FOR LINE ITEMS 033 & 034" | |||||
| TRI Models INC | $655.1K | FY 2025 | 4 | FA910124CB002 | |
METAL FABRICATION - COMPLEX - PROVIDE ALL LABOR TO FABRICATE (QTY. 2) 3.0 X 7.0 NOZZLE EXTENSION ASSEMBLIES PER DRAWINGS PN635372.941 REV A, PN635372.942 REV B, PN635372.943 REV A, PN635372.944 REV B, PN635372.945 REV B AND ASSEMBLE PER PN635372.940. ALL MATERIAL AND HARDWARE WILL BE PROVIDED. THE VENDOR SHALL SUPPLY A 100% INSPECTION REPORT FOR EACH FABRICATED COMPONENT. QUALITY NOTE 08 AND 19 APPLY. | |||||
| Tattersall Supply, LLC | $623.9K | FY 2025 | 12 | FA910124CB002 | |
PIPE REDUCERS | |||||
| Forty TO Four Consulting, LLC | $550.8K | FY 2025 | 2 | FA910124CB002 | |
PEOPLESOFT CONSULTING SERVICES. CONSULTING LABOR HOURS TO SUPPORT THE PEOPLESOFT FSCM V9.1 TO V9.2 UPGRADE. | |||||
| Thompson Machinery Commerce Corporation | $548.9K | FY 2025 | 8 | FA910124CB002 | |
RENTAL - SCISSOR LIFT, ROUGH TERRAIN GENIE GS-3268RT, JLG 33RTS OR SIMILAR. 12 MONTH RENTAL WITH POSSIBLE EXTENSION. | |||||
| Microtech Computers, INC. | $545.2K | FY 2025 | 2 | FA910124CB002 | |
SYSTEM -- PROCYON SE1210-24 RACKMOUNT SERVER. 1 | |||||
| American Pipe & Supply CO, INC | $542.8K | FY 2025 | 3 | FA910124CB002 | |
ASSORTED PIPING, ELBOWS, AND FLANGES | |||||
| NEW Tech Solutions, INC. | $528.9K | FY 2025 | 8 | FA910124CB002 | |
WALL, VIDEO, CONSISTING OF NINE 55"" MONITORS IN A 3 X 3 CONFIGURATION WITH TWO SPARE MONITORS, 165"" DIAGONAL SIZE. INCLUDES WALL MOUNTS, VIDEO CONTROLLER AND REMOTE POWER SUPPLY ELECTRONICS, POWER REDUNDANCY OPTION, TRIM KIT AND 200 FT POWER AND VIDEO CABLES. PLANAR CLARITY MATRIX 3X3 COMPLETE PN 998-1882. 998-1882 PLANAR SYSTEMS THIS ORDER IS PLACED UNDER WRITTEN AUTHORIZATION FROM THE DEPARTMENT OF THE AIR FORCE DATED 30 AUGUST 2024 A COPY OF WHICH IS ATTACHED. IN THE EVENT OF ANY INCONSISTENCY BETWEEN THE TERMS AND CONDITIONS OF THIS ORDER AND THOSE OF THE FEDERAL SUPPLY SCHEDULE OR PERSONAL PROPERTY REHABILITATION PRICE SCHEDULE CONTRACT, THE LATTER WILL GOVERN. | |||||
Alerts are coming
Get an email when Beyond NEW Horizons, LLC's disclosed suppliers or customers change. Join the list and we'll tell you when alerts launch. One email, no spam.