Firelake-diversified JV2 LLC
Customers
1
1 federal agency
Suppliers
3
3 federal subcontractors
Largest customer
—
No % disclosed
Named-customer revenue
—
No estimate available
Federal obligations
$1.3M
FY2025 · USAspending.gov
Federal contracts 1
Agencies that awarded contracts to this company, from USAspending.gov. Dollars are obligated amounts as reported, not estimates; $1.3M in the latest fiscal year shown per agency.
| Agency | Obligated | Fiscal year | Awards | Trend | Largest award |
|---|---|---|---|---|---|
| Environmental Protection Agency
Environmental Protection Agency |
$1.3M | FY 2025 | 7 | $13.2M → $15.2M → $1.3M | 68HERC23F0558 |
ORD/R6 LAB CONSOLIDATION PROJECT ADA, OK - PHASE 1 | |||||
Federal subcontractors 3
Companies this contractor subcontracted work to on federal prime contracts. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| Oklahoma Electrical Supply CO | $4.6M | FY 2025 | 7 | 68HERC24F0423 | |
"• ABIDE BY THE CODES MENTIONED IN G-002. • PERFORM FULL DIVISION 26 AND 28 AS INDICATED IN PLANS, SPECS, AND AMENDMENTS. • SHALL BE RESPONSIBLE FOR ALL SCOPE OF WORK IDENTIFIED IN ELECTRICAL DRAWING SHEETS AND ASSOCIATED SPECS. • PERFORM ALL TESTING, COMMISSIONING ASSISTANCE, SHORT CIRCUIT COORDINATION STUDY, OVER-CURRENT PROTECTIVE STUDY, AND INSPECTION PER CONTRACT DOCUMENTS. • LABELING FOR THEIR ENTIRE SCOPE OF WORK PER THE CONTRACT DOCUMENTS. • SHALL CONFIRM DIMENSIONS, SIZES, AND FITMENT OF ALL EQUIPMENT AND MATERIALS PROVIDED PRIOR TO ORDERING AND OR INSTALLATION. • SHALL CONFIRM INTERFACE OF NEW PARTS, EQUIPMENT, ETC. WITH EXISTING. • SHALL CONFIRM ALL WORK, EQUIPMENT, ETC. CONFORMS TO SPEC REQUIREMENTS PRIOR TO ORDERING AND OR INSTALLATION. • TERMINATION AND GROUNDING AS PER CONTRACT REQUIREMENTS. • CONDUIT, RACEWAYS, POWER SUPPLY AND ALL REQUIRED APPURTENANCES AS PER SCOPE REQUIREMENT. • SHALL BE RESPONSIBLE FOR ANY CHANGES PER THE AMENDMENTS. • SHALL BE RESPONSIBLE FOR ANY TEMPORARY POWER (120V ONLY), LIGHTING AS REQUIRED. • SEISMIC PROTECTION AS REQUIRED. • LAYOUT FOR THEIR SCOPE OF WORK. • PROVIDE AND INSTALL DUCT BANK FOR THEIR SCOPE. • PROVIDE RACEWAYS AND POWER BETWEEN CRU AND CONDENSING UNITS. • PROVIDE AND FILL FUEL AS REQUIRED FOR SYSTEM STARTUP, TESTING, AND COMMISSIONING ASSISTANCE. AFTER, PROVIDE AND FILL FULL TANK OF FUEL IN THE GENERATOR FOR ONE TIME." | |||||
| Trade Mechanical Contractors INC | $4.4M | FY 2025 | 11 | 68HERC24F0453 | |
"1. WILL INCLUDE THE PLUMBING AND MECHANICAL SCOPE OF TASK ORDER 03. 2. ABIDE BY THE CODES MENTIONED IN G-002. 3. ABIDE TO GENERAL PLUMBING, MECHANICAL, AND SPECIAL FIRE PROTECTION NOTES. 4. PERFORM ALL PLUMBING AND MECHANICAL SCOPE OF WORK PER PLANS AND SPECS. 5. SHALL FABRICATE AND INSTALL HVAC DUCTWORK, FUME HOOD POLYPROPYLENE PIPE. 6. SHALL FURNISH AND INSTALL ALL HVAC EQUIPMENT THAT INCLUDES NEW AHU, GRILLES, REGISTERS, & DIFFUSERS, AIR VALVES - GENERAL EXHAUST, AIR VALVES - FUME EXHAUST, & AIR VALVES - SUPPLY WITH DUCT REHEAT COILS AND OTHER EQUIPMENT AS SPECIFIED IN THE CONTRACT DOCUMENTS. 7. PERFORM COMPLETE SCOPE OF WORK ON DDC CONTROLS. 8. SANITARY SEWER, ACID WASTE, DOMESTIC HOT & COLD WATER, RO WATER, LIQUID NITROGEN, AND LABORATORY GAS PIPING. 9. MECHANICAL INSULATION AS REQUIRED. 10. SHALL PROVIDE AND INSTALL LABELLING AS REQUIRED FOR ANY MATERIALS/EQUIPMENT IN THEIR SCOPE OF WORK. 11. PERFORM ALL TESTING, INSPECTION, TAB, AND COMMISSION ASSISTANCE PER CONTRACT DOCUMENTS. 12. SHALL INSTALL DUCT TRANSITIONS ON FUME HOODS AND FURNISH/INSTALL REFRIGERANT PIPING ON CONTROLLED ENVIRONMENTAL ROOMS. 13. SHALL CONFIRM DIMENSIONS OF ALL DUCTS, EQUIPMENT, MATERIALS ETC. PRIOR TO ORDERING AND OR INSTALLATION. 14. SHALL CONFIRM INTERFACE OF NEW PARTS, EQUIPMENT, ETC. WITH EXISTING. 15. SHALL CONFIRM ALL WORK, EQUIPMENT, ETC. CONFORMS TO SPEC REQUIREMENTS PRIOR TO ORDERING AND OR INSTALLATION. 16. SHALL BE RESPONSIBLE FOR ANY CHANGES PER THE AMENDMENTS. 17. SHALL VACUUM AND CLEAN ALL THE DIFFUSERS AND RETURN GRILLES UPON INSTALLATION. 18. SHALL BE RESPONSIBLE FOR PARTICULATE TESTING FOR NEW LABORATORY PIPING. 19. INCLUDE SALES TAXES AND BONDS. • PROVIDE DOAS-1 WITH THE NEW UPGRADE REFRIGERANT 454B" | |||||
| H2I Group INC. | $980.9K | FY 2025 | 7 | 68HERC24F0453 | |
"1. WILL INCLUDE THE SCOPE OF TO3 AS PER PLAN AND SPECS. 2. ABIDE BY THE CODES MENTIONED IN G-002. 3. PROVIDE MATERIALS, FABRICATION, CONSTRUCTION, AND INSTALLATION OF ALL QUOTED ITEMS SUCH AS BUT NOT LIMITED TO CASEWORK, TOPS, SINKS, FIXTURES, WORK TOPS, FUME HOODS, DUCT TRANSITIONS, PER H2I GROUP QUOTE AND PLANS AND SPECS. 4. PERFORM MEASUREMENT, SHOP DRAWINGS, AND SUBMITTALS AS REQUIRED PER THE CONTRACT DOCUMENTS. 5. SHALL CONFIRM DIMENSIONS, SIZES, AND FITMENT OF ALL EQUIPMENT AND MATERIALS PROVIDED PRIOR TO ORDERING AND OR INSTALLATION. 6. SHALL CONFIRM INTERFACE OF NEW PARTS, EQUIPMENT, ETC. WITH EXISTING. 7. SHALL CONFIRM ALL WORK, EQUIPMENT, ETC. CONFORMS TO SPEC REQUIREMENTS PRIOR TO ORDERING AND OR INSTALLATION. 8. LABELLING AS PER SCOPE AND CONTRACT REQUIREMENT. 9. SHALL BE RESPONSIBLE FOR ANY CHANGES PER THE AMENDMENTS" | |||||
Alerts are coming
Get an email when Firelake-diversified JV2 LLC's disclosed suppliers or customers change. Join the list and we'll tell you when alerts launch. One email, no spam.