Sealaska Constructors LLC
Customers
2
2 federal agencies
Suppliers
4
4 federal subcontractors
Largest customer
—
No % disclosed
Named-customer revenue
—
No estimate available
Federal obligations
$12.5M
FY2026 · USAspending.gov
Federal contracts 2
Agencies that awarded contracts to this company, from USAspending.gov. Dollars are obligated amounts as reported, not estimates; $23.9M in the latest fiscal year shown per agency.
| Agency | Obligated | Fiscal year | Awards | Trend | Largest award |
|---|---|---|---|---|---|
| Department of the Interior
National Park Service |
$12.5M | FY 2026 | 20 | $16.3M → $27.4M → $12.5M | 140P2026C0045 |
GRCA 352119 CRITICAL UTILITIES RESTORATION | |||||
| Department of Defense
Department of the Army |
$11.4M | FY 2025 | 5 | $5.5M → $11.4M | W912DW25F2056 |
REPAIR HVAC FOR BUILDING 09630 AND 09640 | |||||
Federal subcontractors 4
Companies this contractor subcontracted work to on federal prime contracts. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| AXC Innovations INC | $1.3M | FY 2023 | 2 | FA461023F0010 | |
ELECTRICAL/GENERATOR | |||||
| J.R. Barto Heating/air-conditioning/sheet Metal, INC. | $807.5K | FY 2023 | 1 | FA461023F0010 | |
PROVIDE ALL MATERIAL, EQUIPMENT AND LABOR REQUIRED TO COMPLETE HVAC WORK PER PLANS, SPECS | |||||
| Paul D. Potter JR | $753.5K | FY 2023 | 1 | FA461022F0086 | |
1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT. 2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP. 3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION. 4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE. 5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED. 6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT. 7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES. 8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED | |||||
| Alpha Fire Unlimited | $694.7K | FY 2023 | 1 | FA461023F0010 | |
FIRE ALARM SYSTEM AND DESIGN, WET PIPE FIRE SPRINKLER SYSTEM AND DESIGN, CLEAN AGENT DIRE SUPPRESSION SYSTEM AND DESIGN | |||||
Alerts are coming
Get an email when Sealaska Constructors LLC's disclosed suppliers or customers change. Join the list and we'll tell you when alerts launch. One email, no spam.