Firelake Construction, INC.
Customers
7
5 federal agencies, 2 prime contractors
Suppliers
9
9 federal subcontractors
Largest customer
—
No % disclosed
Named-customer revenue
—
No estimate available
Federal obligations
$8.8M
FY2026 · USAspending.gov
Federal contracts 5
Agencies that awarded contracts to this company, from USAspending.gov. Dollars are obligated amounts as reported, not estimates; $29.5M in the latest fiscal year shown per agency.
| Agency | Obligated | Fiscal year | Awards | Trend | Largest award |
|---|---|---|---|---|---|
| Department of the Interior
Bureau of Reclamation |
$13.5M | FY 2025 | 2 | 140R6025C0003 | |
REPAIRS TO CONCRETE DAMAGE ON MEDICINE CREEK DAM AND ADDITION OF SITE ACCESS ROAD. | |||||
| Department of Agriculture
Agricultural Research Service |
$6.0M | FY 2026 | 34 | $14.2M → $31.9M → $6.0M | 1232SA26F0205 |
NBAF - INSTALLATION OF ELEVATED SERVICE AND STORAGE PLATFORMS CONSTRUCTION | |||||
| Department of Defense
Department of the Navy |
$3.7M | FY 2025 | 29 | $2.7M → $4.7M → $3.7M | N4008525F0476 |
TASK ORDER; FUND RECURRING SERVICES (CLIN 0003); POP 08-01-2025 TO 07-31-2026 | |||||
| Department of Transportation
Federal Aviation Administration |
$3.4M | FY 2024 | 2 | 6973GH24C00137 | |
WO#22-026573 PTS UPGRADES | |||||
| General Services Administration
Public Buildings Service |
$2.8M | FY 2026 | 3 | 47PD5126F0027 | |
GSA, WICHITA NORTH FACADE CLEANING & TUCKPOINTING TO BE PERFORMED AT THE WICHITA U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KANSAS 67202 | |||||
Federal subcontractors 9
Companies this contractor subcontracted work to on federal prime contracts. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| P1 Construction LLC | $4.8M | FY 2025 | 10 | 1232SA25F0103 | |
THE SUBCONTRACTOR IS RESPONSIBLE FOR PROVIDING DELIVERABLES FOR ALL MATERIAL AND LABOR REQUIRED FOR THE 1-6 LAB PRESSURE MONITOR (PM) REPLACEMENT PROJECT IN ACCORDANCE WITH THE PROJECT PLANS, SPECIFICATIONS, AND DRAWINGS AND THE CONTRACT DOCUMENTS | |||||
| Wagner Building & Supply CO INC | $3.3M | FY 2025 | 13 | 140FGA25C0002 | |
"1. EARTHWORK 2. BUILDING CONCRETE 3. EXTERIOR CONCRETE WITH BOLLARDS 4. TRENCH DRAINS 5. STEEL BUILDINGS WITH INSULATION 6. ALL INTERIOR & EXTERIOR DOORS/WINDOWS WITH HARDWARE 7. INTERIOR WALL FINISHES (LINER, PLYWOOD) 8. INTERIOR FRAMING, SHEETROCK, PAINT, ACOUSTICAL CEILINGS 9. CABINETS & TOPS 10. ELECTRICAL 11. PLUMBING/HVAC A. ADD FOR IN FLOOR HEAT/BOILER PACKAGE 12. BOND" | |||||
| MVP LLC | $2.2M | FY 2025 | 1 | 1232SA25F0072 | |
2.3.3, 2.3.3.1, 2.3.3.2 ALSO ALL LINE ITEMS UNDER 2.4 TASK WITH THE EXCEPTIONS OF 2.4.4.2, 2.4.4.3 AND 2.4.4.4 ALSO OF NOTE ON 2.4.1.2 MVP WILL BE RESPONSIBLE TO CLEAN ALL RESIDUAL GEL FROM THE ENCLOSURE AND SURROUNDING AREAS WHERE PREVIOUSLY APPLIED SEALING EFFORTS WERE UNSUCCESSFUL. ALL LOCATIONS COULD BE REPEATABLE UNTIL FINAL TESTING SHOWS THEY HAVE PASSED. | |||||
| Vannahmen Construction, INC. | $2.2M | FY 2025 | 2 | 140R6025C0003 | |
"BOND WITHIN 30 DAYS OF WHEN ON-SITE WORK IS TO BEGIN SAW CUT & CORE DRILL SPILLWAY FLOOR PANELS 1 THRU 56 AS OUTLINED ON DRAWING 328-600-60066 THROUGH 328-606-60073, AND IN ACCORDANCE WITH ALL AMENDMENTS. PLACE CONCRETE IN SPILLWAY FLOOR PANELS 1 THRU 56 AS OUTLINED ON DRAWING 328-600-60066 THROUGH 328-606-60073, AND IN ACCORDANCE WITH ALL AMENDMENTS. SAW CUT & CORE DRILL SPILLWAY WALL PANELS 89 THRU 96 AS OUTLINED ON DRAWING 328-600-60074 THROUGH 328-606-60076, AND IN ACCORDANCE WITH ALL AMENDMENTS. PLACE CONCRETE IN SPILLWAY WALL PANELS 89 THRU 96 AS OUTLINED ON DRAWING 328-600-60074 THROUGH 328-606-60076, AND IN ACCORDANCE WITH ALL AMENDMENTS. BRIDGE PIER CONCRETE REMOVAL AND REPAIR PER PLANS PG. 328-600-60077 AND PER SPECIFICATIONS. STILLING BASIN CONCRETE REMOVAL & REPAIR PER PLANS PG. 328-600-60078 AND PER SPECIFICATIONS. REMOVAL OF CONTROL WATER. REMOVAL OF ALL BULK DEBRIS AND CONCRETE DEBRIS FROM SITE. PROVIDE TRAFFIC CONTROL & TRAFFIC CONTROL PLAN FOR YOUR SCOPE. I.E. BUCKET TRUCK USE & NEEDED LANE CLOSURE PROVIDE A FULLY COMPREHENSIVE WORK PLAN, THAT INCLUDES PHASES OF WORK, DURATION PER PHASE, MEANS & METHODS TO ENSURE TIMELY COMPLETION OF SCOPE, AND INCLUDE SAFETY MEASURES TO BE USED. PROVIDE AN ACTIVITY HAZARD ANALYSIS FOR YOUR SCOPE. PROVIDE A BASELINE SCHEDULE (TENTATIVELY BETWEEN MARCH 2026 THROUGH NOVEMBER 2026). PROVIDE THE FOLLOWING SUBMITTALS: (THIS LIST IS REPRESENTATIVE AND MAY NOT CAPTURE ALL THAT ARE NEEDED.) USE OF SITE PLAN AS APPLICABLE TO SCOPE PER SPEC SECTION 01_14_10-1 SDS SHEETS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_10 TRAINING CERTS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_20-6 WATER POLLUTION CONTROL PLAN / WATER MANAGEMENT PLANS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_57_30-1 CLEANING AND WASTE MANAGEMENT PLAN/ WASTE PRODUCTION & DISPOSAL RECORDS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1 PROJECT RECORD DOCUMENTATION (RED LINES) AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1 CAST-IN-PLACE CONCRETE APPROVED DATA (MIX DESIGN) AS APPLICABLE TO SCOPE PER SPEC SECTION 03_30_00 CAST-IN-PLACE CONCRETE CERTIFICATIONS AS APPLICABLE TO SCOPE PER SPEC SECTION 03_30_00-2 CONCRETE REMOVAL PLAN AS APPLICABLE TO SCOPE PER SPEC SECTION 03_81_10-1" | |||||
| AK Industrial Services LLC | $1.1M | FY 2025 | 1 | 140R6025C0003 | |
HYDRO-DEMO | |||||
| Skillman Construction, LLC | $901.5K | FY 2025 | 1 | 140R6025C0003 | |
"BOND CONSTRUCT A NEW ACCESS ROAD PER PLANS & SPEC’S INSTALL NEW CULVERT CROSSING PER PLANS & SPEC’S PROVIDE TRAFFIC CONTROL & TRAFFIC CONTROL PLAN FOR YOUR SCOPE. I.E. CROSSING TO BORROW SITE. PROVIDE A FULLY COMPREHENSIVE WORK PLAN, THAT INCLUDES PHASES OF WORK, DURATION PER PHASE, MEANS & METHODS TO ENSURE TIMELY COMPLETION OF SCOPE, AND INCLUDE SAFETY MEASURES TO BE USED. PROVIDE AN ACTIVITY HAZARD ANALYSIS FOR YOUR SCOPE. PROVIDE A BASELINE SCHEDULE (TENTATIVELY BETWEEN AUGUST 2025 THROUGH DECEMBER 2025). PROVIDE THE FOLLOWING SUBMITTALS: (THIS LIST IS REPRESENTATIVE AND MAY NOT CAPTURE ALL THAT ARE NEEDED.) USE OF SITE PLAN AS APPLICABLE TO SCOPE PER SPEC SECTION 01_14_10-1 SDS SHEETS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_10 TRAINING CERTS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_20-6 WATER POLLUTION CONTROL PLAN / WATER MANAGEMENT PLANS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_57_30-1 CLEANING AND WASTE MANAGEMENT PLAN/ WASTE PRODUCTION & DISPOSAL RECORDS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1 PROJECT RECORD DOCUMENTATION (RED LINES) AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1 CONTROLLED LOW STRENGTH MATERIAL (CLSM) PRODUCT DATA AS APPLICABLE TO SCOPE PER SPEC SECTION 31_23_70-1 EARTH WORK FOR ROAD WAYS, MATERIAL GRADATIONS PER SPEC SECTION 31_24_20-1 MATERIAL WEIGH TICKETS PER SPEC SECTION 31_24_20-2 RIPRAP APPROVED DATA & TEST RESULTS PER SPEC SECTION 31_37_10-1" | |||||
| Accutec Services, INC. | $726.8K | FY 2025 | 3 | 1232SA25F0110 | |
TEST, ADJUST, AND BALANCE SERVICES FOR NBAF LAB SPACE AIR SYSTEMS, INCLUDING AIR SYSTEMS TAB, SUBMITTALS, SITE MOBILIZATION, EQUIPMENT, CLOSEOUT DOCUMENTS, AND WORK PER PLANS/SPECIFICATIONS/SOW. | |||||
| Delta Electronics, INC. | $594.3K | FY 2025 | 1 | 1232SA25F0103 | |
2.2.1 LABORATORY PRESSURE MONITOR (PM) (LABORATORY DISPLAY UNIT (LDU)) 2.2.1.1 PMS (LDUS) SHALL BE LOYTEC LPAD 7 WHICH PHYSICAL MODELS ARE AVAILABLE FOR REVIEW ON SITE. 2.2.1.2 PMS (LDUS) SHALL INTERFACE WITH EXISTING WIRING, WHICH INCLUDES A 1X 18/2 CONDUCTOR CABLE FOR POWER (SUPPORTING EITHER 24V AC OR DC), AND A 1X 18/2 CONDUCTOR CABLE FOR THE DEDICATED PRESSURE SIGNAL FROM THE DIFFERENTIAL PRESSURE SENSOR (CURRENTLY CONFIGURED FOR 0-10VDC), AND AN RS-485 CABLE FOR BACNET COMMUNICATION. 2.2.1.3 PROVIDE LOYTEC CONVERTER SWITCHES FOR EACH PM (LDU) TO INTERFACE TO THE RS-485 TO ALLOW NETWORK INTERFACE BETWEEN THE PM AND THE BAS NETWORK. | |||||
| The Schemmer Associates INC. | $549.6K | FY 2025 | 1 | 140FGA25C0002 | |
"PRE-DESIGN AND DESIGN PHASE SERVICES: BASED ON THE D-B SOLICITATION SCOPE OF WORK ISSUED BY THE F&WS, WE WILL PREPARE DESIGN DEVELOPMENT DOCUMENTS AND CONSTRUCTION DOCUMENTS CONSISTING OF DRAWINGS, SPECIFICATIONS, CALCULATIONS, AND OTHER DOCUMENTS AS REQUIRED BY THE D-B SCOPE OF WORK. THE GENERAL SCOPE IS TO DEMOLISH TWO FACILITIES (BUNKHOUSE AND MAINTENANCE FACILITY) AND DESIGN A NEW BUNKHOUSE, MAINTENANCE FACILITY, AND 2 GARAGE / OPEN STORAGE FACILITIES. ALL WORK IS AT LAKE ANDES NATIONAL WILDLIFE REFUGE, SOUTH DAKOTA. THE DESIGNS WILL BE DONE IN REVIT AND AUTOCAD DWG FILES WILL BE CREATED FOR THE FINAL SUBMISSION TO SUBMIT TO THE F&WS. THE DESIGNS WILL BE BASED OFF D-B BRIDGING DOCUMENTS AND CONCEPT DRAWINGS AND NARRATIVES PROVIDED FOR THE D-B TEAM'S FINAL PROPOSAL ON 24 OCT 2024. DESIGN SERVICES WILL INCLUDE DESIGN MANAGEMENT, DESIGN QUALITY CONTROL, TOPOGRAPHICAL SURVEY, ARCHITECTURE, STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND SEPTIC SYSTEM ENGINEERING. WE WILL SUBMIT A 30%, 60%, 95% AND 100% (FINAL) SUBMITTAL TO YOU FOR SUBMISSION TO THE F&WS AND WILL PARTICIPATE IN THE DESIGN REVIEW CONFERENCES VIRTUALLY. CONSTRUCTION PHASE SERVICES: VISIT THE CONSTRUCTION SITE AT APPROPRIATE INTERVALS [APPROXIMATELY ONCE A MONTH]. PREPARE OBSERVATION REPORTS. REVIEW AND APPROVE SHOP DRAWINGS RESPOND TO REQUESTS FOR INFORMATION (RFLS). CONDUCT PREFINAL AND FINAL PUNCH LIST INSPECTIONS. PREPARE AS-BUILT DRAWINGS BASED ON CONSTRUCTION REDLINE DRAWINGS." | |||||
Federal subcontracts received 2
Prime contractors that subcontracted federal work to this company. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| Firelake-arrowhead Nasa Services | $1.8M | FY 2025 | 16 | 80GRC018C0022 | |
AS-NEEDED AD HOC LABOR AND ODCS TO SUPPORT CLIN 3 OF THE CMIST-2 CONTRACT INCLUDING SUPPORT FROM FIRELAKE IN ACCORDANCE WITH THE NASA CMIST-2 SOW AND FIRELAKE'S BOA. | |||||
| Mill Creek Firelake JV LLC | $1.6M | FY 2025 | 4 | 12805B24F0268 | |
PROJECT MANAGEMENT AND ADMINISTRATIVE SUPPORT | |||||
Alerts are coming
Get an email when Firelake Construction, INC.'s disclosed suppliers or customers change. Join the list and we'll tell you when alerts launch. One email, no spam.