Federal contracts 3
Agencies that awarded contracts to this company, from USAspending.gov. Dollars are obligated amounts as reported, not estimates; $10.4M in the latest fiscal year shown per agency.
| Agency | Obligated | Fiscal year | Awards | Trend | Largest award |
|---|---|---|---|---|---|
| Department of Transportation
Federal Aviation Administration |
$6.5M | FY 2025 | 2 | $5.5M → $6.5M | 6973GH25C00096 |
REPLACEMENT OF THE EXISTING LOW LEVEL WIND SHEAR ALERT SYSTEM (LLWAS) #2 BAY PLATFORM AT SAN FRANCISCO INTERNATIONAL AIRPORT (SFO)CALIFORNIA IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS. | |||||
| General Services Administration
Public Buildings Service |
$2.3M | FY 2026 | 34 | $8.7M → $2.8M → $2.3M | 47PE5526F0028 |
DHHS IHS SECURITY UPGRADES (TN2500ZZ) 711 STEWARTS FERRY PIKE NASHVILLE TN 37214 | |||||
| Department of Defense
Department of the Army |
$1.6M | FY 2025 | 9 | $1.6M → $15.9M → $1.6M | W912DR22C0058 |
REPAIR STORMWATER FOR 6 OUTFALLS & SECURITY FENCE @ JOINT BASE ANDREWS, MARYLAND | |||||
Federal subcontractors 6
Companies this contractor subcontracted work to on federal prime contracts. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| Ames 1-HWH JV, LLC | $11.1M | FY 2025 | 1 | W912DR24C0057 | |
ALL WORK FOR OUTFALLS 1, 1A, 1B, 1C AND 3 PER PLANS AND SPECS. | |||||
| Power Engineering Construction Company | $3.5M | FY 2025 | 1 | 6973GH25C00096 | |
DEMO EXISTING TIMBER STRUCTURE DRIVE 14” PRODUCTION PIPE PILES. INSTALL HDPE SLEEVES & ANODES. INSTALL FIBERGLASS AND STEEL PLATFORM. | |||||
| Rembco Geotechnical Contractors, INC. | $1.8M | FY 2025 | 1 | 47PE0324C0004 | |
PROVIDE DESIGN AND CONSTRUCTION FOR THE STABILIZATION OF THE HOWARD BAKER FEDERAL BUILDING | |||||
| Demo Plus Group, INC | $1.7M | FY 2025 | 1 | 47PE0625F0079 | |
DEMOLITION OF THE EXISTING BUILDING, SECURE AND FILLING OF EXISTING TUNNEL ENTRANCE, AND NECESSARY SITE PREPARATION | |||||
| Richardson Construction Group, LLC | $1.6M | FY 2025 | 1 | 47PE0324C0004 | |
PROVIDE DESIGN AND CONSTRUCTION FOR ROOF REPLACEMENT OF THE HOWARD BAKER FEDERAL BUILDING. | |||||
| Chitina Support Services, LLC | $727.3K | FY 2025 | 2 | W912DR24C0057 | |
PROVIDE FULL TIME SITE SAFETY PERSONNEL, SAFETY REPORT PREPARATION, GENERAL REPORTING REQUIREMENTS, AND SUPPORTING CLOSEOUT PREPARATION OF DOCUMENTS. | |||||
Federal subcontracts received 1
Prime contractors that subcontracted federal work to this company. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| Chitina Diversified -ames 1 JV LLC | $6.8M | FY 2025 | 1 | 140P2025C0034 | |
EVERYTHING NECESSARY TO PERFORM ALL WORK FOR QUALITY CONTROL, GENERAL CONDITIONS AND STLI 324873 FINAL CONSTRUCTION DOCUMENTS, DATED APRIL 11, 2025. INCLUDES BUT NOT LIMITED TO DIVISION 02 -- EXISTING CONDITIONS (PARTIALLY EXCLUDES TENT DEMO), DIVISION 03 -- CONCRETE, DIVISION 05 – METALS, DIVISION 06 – WOOD, PLASTICS & COMPOSITES, DIVISION 07 -- THERMAL AND MOISTURE PROTECTION, DIVISION 09 – FINISHES, DIVISION 12 – FURNISHINGS, DIVISION 20 – MECHANICAL, DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC), DIVISION 26 – ELECTRICAL, DIVISION 27 – COMMUNICATIONS, DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY, DIVISION 31 – EARTHWORK, DIVISION 32 -- EXTERIOR IMPROVEMENTS AND OPTION 3 RESTROOM RENTAL | |||||