West Pacific Electric Company Corporation
Customers
2
2 prime contractors
Suppliers
0
None disclosed
Largest customer
—
No % disclosed
Named-customer revenue
—
No estimate available
Federal subcontracts received 2
Prime contractors that subcontracted federal work to this company. From USAspending.gov subaward reports; amounts are as reported by the prime contractor, latest report per subaward, $500K+ a year.
| Company | Subawards | Fiscal year | Count | Trend | Largest subaward |
|---|---|---|---|---|---|
| CM Construction Services, INC. | $25.9M | FY 2025 | 3 | $15.9M → $13.6M → $25.9M | FA461024F0207 |
DEVELOP, SUPPLY A B9 & B7 CIRCUIT COORDINATION STUDY. • ALL OUTAGE NARRATIVES AND MOPS WILL BE WRITTEN BY WPEC WITH PERFORMANCE DATES AND TIMES STATED IN THE WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CE SWITCHING SCHEDULE AND REQUEST MADE BY WPEC. • PERFORM TRAFFIC CONTROL PER PLAN (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER) • USE OF VACUUM UTILITY LOCATING • OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED • FOR ELECTRICAL WORK ONLY WPEC TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE SOILS, SAND AND OR RED CONCRETE ENCASED DUCT BANK. • ROADWAY REPAIR “PATCH WORK” FOR ELECTRICAL WORK ONLY. • EARTHWORK FOR ALL SECTIONAL SWITCHES AND TRANSFORMER EQUIPMENT PADS, DEPRESSED CURBS, SIDEWALKS & RAMP REPAIR. • IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION ACTIVITIES WILL NOT BE COMMENCED OR CONTINUED UNLESS THE PARTIES AGREE UPON ADDITIONAL COMPENSATION AND OR ADDITIONAL TIME FOR COMPLETION AND THE CONTRACT IS ADJUSTED ACCORDINGLY. • SUPPLY ALL CONCRETE AND ASPHALT MATERIALS AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL WORK REQUIRED TO COMPLETE THE PROJECT. • ALL TREE TRIMMING/REMOVAL, GRUB AND CLEAR WILL FOLLOW VAFB STANDARDS WILL BE PERFORMED DURING THE NONNESTING AND DRY SEASON. | |||||
| J G Contracting | $680.8K | FY 2023 | 1 | FA461023C0008 | |
WORK WITH ELECTRICAL ENGINEERING THROUGH THE DEVELOPMENT OF 35% THROUGH 100% READY FOR CONSTRUCTION PLANS AND SPECIFICATIONS · SUBCONTRACTOR UTILITY VERIFICATION BY WAY OF HYDRO-VACUUMING AFTER ALL LOCATIONS FOR EXCAVATION HAVE BEEN MARKED BY OTHERS (THIS CAN BE DONE IN PHASES TO PROTECT SURVEY MARKINGS) · PROVIDE AND OR TESTING OF €œVLF CABLE TESTING, 3 POINT FALL GROUNDING, RELAYS, BREAKERS, TRANSFORMERS, POLE & PADMOUNT SWITCHES, GROUND FAULT, TESTING AND NEW STREET LIGHTING WITH PHOT CONTROL ON EACH FIXTURE TOTAL OF FIVE · ALL OUTAGE NARRATIVE WILL BE WRITTEN BY SUBCONTRACTOR WITH PERFORMANCE TIMES STATED IN THE WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CES SWITCHING SCHEDULE AND REQUEST MADE BY SUBCONTRACTOR · PERFORM TRAFFIC CONTROL (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER) · USE OF VACUUM UTILITY LOCATING · OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED · FOR ELECTRICAL WORK ONLY SUBCONTRACTOR TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE SOILS, SAND AND OR RED CONCRETE ENCASED DUCT BANK. (COMPACTION CONCRETE AND OR SOILS TESTING BY QA-OTHER) · ALL ELECTRICAL EQUIPMENT PADS BY SUBCONTRACTOR · IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION ACTIVITIES SHALL BE HAULTED UNTIL ALL PARTIES MUTUALLY AGREE UPON ADDITIONAL COMPENSATION AND/OR ADDITIONAL TIME FOR COMPLETION WITH CONTRACT ADJUSTED ACCORDINGLY · SUPPLY ALL CONCRETE AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL PORTION OF THE PROJECT · REMOVAL OF ALL ELECTRICAL COMPONENTS, POLES, WIRE CROSSARMS, INSULATORS, CUTOUTS, POLE MOUNT AND PADMOUNT TRANSFORMERS AND DELIVER TO EITHER VAFB RECYCLE OR THE HAZMAT CONTRACTOR BGI | |||||